BATHROOM RENOVATION

ALBERTON RESIDENCE

We carried out a full ensuite construction and fitout to a previous dining room space.
In preparation, the old timber floorboard and joists were removed and new underfloor drainage laid.
A new concrete floor was poured and new stud walls built and installed. The existing sash window was removed and bricked up and a new linier window installed to the new bathroom.
Once all the first fix plumbing and electrical was completed, the two existing solid walls were re-rendered and new walls sheeted in preparation for the tiling to begin.
All fixtures, accessories and show screen were installed completing the project.

SERVICES SUPPLIED

icon-01
DEMOLITION

Removal of all existing floorboards, joists and sash window.

icon-01
FIRST FIX

Installation of brick work to existing window location, concrete floors, stud walls, gyprock and linear window.

icon-2
PLUMBING

Running all required plumbing for reconfigured space.

icon-01
second fix

Installation of all new fixtures and fittings - vanity, taps, toilet, towel rails, shower screen etc.

AFTER (1)
AFTER (2)
AFTER (3)
AFTER (4)
AFTER (5)
AFTER (6)
AFTER (7)
DURING (1)
DURING (2)
DURING (3)
DURING (4)
DURING (5)
DURING (6)
DURING (7)
DURING (8)
DURING (9)
DURING (10)
DURING (11)
DURING (12)
DURING (13)
DURING (14)
DURING (15)
DURING (16)
previous arrow
next arrow
AFTER (1)
AFTER (2)
AFTER (3)
AFTER (4)
AFTER (5)
AFTER (6)
AFTER (7)
DURING (1)
DURING (2)
DURING (3)
DURING (4)
DURING (5)
DURING (6)
DURING (7)
DURING (8)
DURING (9)
DURING (10)
DURING (11)
DURING (12)
DURING (13)
DURING (14)
DURING (15)
DURING (16)
previous arrow
next arrow