BATHROOM RENOVATION

WALKERVILLE RESIDENCE

We were hired to complete a full bathroom transformation for a customer whose bathroom was in need of renovating to their outdated bathroom that no longer suited their needs.
The original layout needed updating and adjusting to better use the space. To create this, sections of the concrete slab had to be removed to replace the underfloor plumbing. All hot and water pipes were chased in to the walls and once all the first fix plumbing and electrical was completed, all walls were then re-rendered in preparation for the tiling to start.
Once the tiling was completed, all fixtures, shower screens and accessories were installed and the transformation was complete ready for use.

On average a project similar to this will take 3 weeks from start to finish and we can project manage the entire project and arrange all required trades.

SERVICES SUPPLIED

icon-01
DEMOLITION

Removal of all existing fixtures and fittings, tiles and gyprock in preparation for required works,

icon-01
FIRST FIX

Installation of gyprock walls ready for tiling to begin with our designated tiler.

icon-2
PLUMBING

Reconfigurating the existing layout to suit the new layout by chasing plumbing through walls and relocating floor plumbing.

icon-01
second fix

Installation of all new fixtures and fittings - vanity, bath, taps, toilet, towel rails etc.

AFTER (8)
AFTER (10)
AFTER (1)
AFTER (2)
AFTER (3)
AFTER (4)
AFTER (5)
AFTER (6)
AFTER (7)
AFTER (9)
AFTER (11)
BEFORE (1)
BEFORE (1)
BEFORE (2)
DURING (1)
DURING (2)
DURING (3)
DURING (4)
DURING (5)
DURING (6)
DURING (7)
previous arrow
next arrow
AFTER (8)
AFTER (10)
AFTER (1)
AFTER (2)
AFTER (3)
AFTER (4)
AFTER (5)
AFTER (6)
AFTER (7)
AFTER (9)
AFTER (11)
BEFORE (1)
BEFORE (1)
BEFORE (2)
DURING (1)
DURING (2)
DURING (3)
DURING (4)
DURING (5)
DURING (6)
DURING (7)
previous arrow
next arrow